Capital Levy Information

In February 2020, Sedro-Woolley School District voters approved a six-year capital levy to fund a wide range of capital improvements to the district's facilities. Proposed improvements focused on maintenance and repair projects to extend the life of all the district's school buildings while also enhancing school safety and technology, improving the energy efficiency and performance of heating, ventilation and air conditioning systems.  

The district will collect $2.5 million per year for six years. This will cost taxpayers 64¢ per $1,000 in increased property taxes in 2021, 64¢ per $1,000 in increased property taxes in 2022, 61¢ per $1,000 in increased property taxes in 2023, 59¢ per $1,000 in increased property taxes in 2024, 57¢ per $1,000 in increased property taxes in 2025 and 55¢ per $1,000 in increased property taxes in 2026.

Capital Levy Project List

Below are initiatives funded by the 2021–2026 Capital Project Levy.

School

Item

Notes

Estimated Timeline

District

School Resource Officer

Pays for six years at $75,000 per year (in partnership with the City of Sedro-Woolley)*

Annual for 6 years

*The district approved an Interlocal Agreement with the City of Sedro-Woolley to hire an School Resource Officer (SRO).

Facility Repairs, Safety, Technology and Space Addition
Fund by the 2021-2026 Capital Project Levy
**Estimated Timeline Updated September 2024

School

RepairItem

Notes

**Estimated Timeline

EVG

Replace the heater and ventilation system

Current unit has met the end of its life; hard to find parts; frequently broken

2024 Winter

DISTRICT

Safety upgrades and maintenance

Continue improving our school safety with more cameras, locks, and alarm systems

Ongoing through 2025

SWHS

Seal the block and bricks - schoolwide

Water is leaking through and damaging the building

2025 Summer

CEN

ADA access added to the front door

Required ADA accommodation; only access now is behind a chain link fence.

2026 or later

CL

Replace the old single portable

The single portable is 30 plus years old; has no windows; has met the end of its useful life

TBD

SSHS

Add handicap accessible restrooms

Required ADA accommodation; stalls too narrow for wheelchair access

2025 Summer

CMS

Replace old gym roof and siding

This building was not repaired during the CMS remodel; the roof needs to be replaced

2025 Summer

SWHS

Replace the Main Building Roof

Numerous leaks; roof is 30 years old and needs to be replaced; has meet the end of its life

2025 or later

BL

Replace the Main Building Roof

Numerous leaks; roof is 30 years old and needs to be replaced; has meet the end of its life

2026 or later

CL

Replace the unit vents in the classrooms

New boiler installed in summer 2019. The unit vents in the classrooms need to be replaced

2025 Summer

CL

Replace the roof

Numerous leaks; roof is 30 years old and needs to be replaced; has meet the end of its life

2026 or later

LYM

Repair sinkholes in asphalt parking area

Area has sinkholes that need to be repaired

2025 Summer or later

SAM

Repair the parking lot and repave

The parking lot has numerous potholes and needs to be repaired

2025 Summer or later

EVG

Flooring replacement - carpet and tile

The flooring has met the end of its life

2026 or later

SAM

Install a backup generator

Keep septic and restrooms running during a power outage

2026 or later

BL

Add and pave parking lot across the street

The parking lot on Lake View would be paved and marked for proper parking

2026 or later

MP

Replace all windows

Current windows leak, are not energy efficient and have met the end of their useful life

2026 or later

EVG

Repair the plumbing

Current plumbing is rusted and has about 80% blockage.

2026 Summer

EVG

Replace and update the restrooms for ADA

Fixtures are old and worn out; more space is needed

2026 Summer

EVG

Replace the roof

Numerous leaks; roof is 30 years old and needs to be replaced; has meet the end of its life

2026 Summer

DISTRICT

On-going technology

$250,000 per year for six years

Annual for 6 years

Completed 2021-2026 Capital Project Levy Projects

DISTRICT

Purchase 4 double portables (8 classrooms)

Use this space to relieve classroom crowding

COMPLETED

SWHS

Replace the C-Building Roof

Numerous leaks; roof is 30 years old and needs to be replaced; has meet the end of its life

COMPLETED

CEN

Replace the roof

Numerous leaks; roof is 30 years old and needs to be replaced; has meet the end of its life

COMPLETED

EVG

Replace siding

Siding is cracked and worn out

COMPLETED

EVG

Replace the gym floor

The current floor has met the end of its life and creates injuries

COMPLETED

SSHS

Replace the heater and ventilation system

Rooftop heaters have meet the end of their life cycle; very inefficient

COMPLETED

LYM

Replace siding

Much of the siding is rotten

COMPLETED

SWHS

Replace the boiler

Current boiler is from the 1950s; requires daily attention; no parts available

COMPLETED

SWHS

Replace the gym roof

Numerous leaks; roof is 30 years old and needs to be replaced; has meet the end of its life

COMPLETED

BL

Replace the B building

Numerous leaks; roof is 30 years old and needs to be replaced; has meet the end of its life

COMPLETED

SWHS

Replace classroom heating units in old building section

Old units will need to be upgraded to work properly with new boiler

COMPLETED

Acronym Key: BL = Big Lake | CL = Clear Lake | CEN = Central | EVG = Evergreen | LYM = Lyman | MP = Mary Purcell | SAM = Samish | CMS = Cascade Middle School | SWHS = Sedro-Woolley High School | SSHS = State Street High School

Project Photo Gallery

Work has been completed on numerous Capital Levy projects at Evergreen Elementary School. The gym floor is being upgraded and a few classrooms have the first new carpet since the building was opened in the early 1970s. Projects at Evergreen will continue as funds from the six-year capital levy continue to be collected.